Concrete roofs, rib slabs

 

Preparation of surface:

  • Cracks can be fixed by, opening up the crack in a V-shape.

  • Remove all dirt and grime and loose flaking particles, with a broom.

  • If practical:- high water pressure cleaning or, hose down the area and clean thoroughly.

  • Allow to dry.

  • Cracks must be filled with cement, river sand and B-bond mixture. Follow cement manufacturers specifications and replace water with B-bond.

  • Expanding and contracting cracks must be sealed using a membrane.

 

Note:

  • B-Earth Products must be stirred well before use.

  • Products can be applied by paintbrush, paint roller or spray gun.

  • Full cure after 72 hours

 

Application:

  • Saturating area to be painted with B-bond, only one coat needed

  • Allow to dry

  • Apply two (2) coats of B-Seal, Allow to dry

  • Apply B-paint of colour choice. Allow for two (2) coats..

 

Cleaning:

  • Products are water based

  • Clean all equipment thoroughly with water immediately after use.

 